After a successful downloading test on the Chondola, focus has now shifted to the uphill tests. The lift will now be loaded to 100% uphill capacity and again go through a variety of tests. The weight for the chairs is supplied with boxes filled with water, while the cabins are still loaded with the bags of ice-melt.