Bottom terminal comes together

October 15, 2008 10:28 by Sunday River

With Fall Festival over and the tents out of the way, work has shifted to the bottom terminal.  Panels are going on this week, the lift building is being framed and the heavy equipment is back to work grading the slope above the terminal.


Related posts

Comments

October 16. 2008 11:33

cant wait

chris

October 24. 2008 04:31

That lift is bad ass.

em dog

November 5. 2008 07:12

they finaly took out the old lift that was there before bout time !

chris

Add comment


 

[b][/b] - [i][/i] - [u][/u]- [quote][/quote]



Live preview

February 8. 2012 03:39

 

sundayriver.com