Bottom terminal comes together

October 15, 2008 10:28 by Sunday River

With Fall Festival over and the tents out of the way, work has shifted to the bottom terminal.  Panels are going on this week, the lift building is being framed and the heavy equipment is back to work grading the slope above the terminal.


Related posts

Comments

October 16. 2008 02:33

cant wait

chris

October 23. 2008 19:31

That lift is bad ass.

em dog

November 4. 2008 22:12

they finaly took out the old lift that was there before bout time !

chris

Add comment


 

[b][/b] - [i][/i] - [u][/u]- [quote][/quote]



Live preview

January 7. 2009 03:52

 

sundayriver.com