Testing the bottom terminal

October 29, 2008 15:12 by Sunday River

One of the shiny new gondola cabins was hung on the bottom terminal today as crews complete earth work around the base of the terminal and under the chair/cabin track.



October 19 Snowmaking

October 19, 2008 11:42 by Sunday River

We made snow this morning with a few of our new fan guns to get the system ready for opening day, which should be just around the corner.  The Chondola bottom terminal and new lift building are visible in the background.


Bottom terminal comes together

October 15, 2008 10:28 by Sunday River

With Fall Festival over and the tents out of the way, work has shifted to the bottom terminal.  Panels are going on this week, the lift building is being framed and the heavy equipment is back to work grading the slope above the terminal.


Towers... done!

October 5, 2008 00:14 by Sunday River
Tower delivery via helicopter started Friday and finished late Saturday morning.  Thanks to Dave from RSN @ Sunday River for the video -- watch below or click here and select "watch in high quality" for the best version.
 
 
 

The towers are going in today.

October 3, 2008 16:50 by Sunday River

The helicopter arrived this morning to start flying in the towers, starting up at the top of the lift and working downhill.  Two rain delays have slowed progress a bit but the crews are still out working.  Stay tuned for video footage.

 


Chondola cabins are here!

October 1, 2008 15:40 by Sunday River

Check it out - the gondola cabins for the Chondola have arrived!  Throughout the day, trucks are delivering them and our crews are moving them into Lot 3 outside of South Ridge for safekeeping. These red cabins with white Sunday River logos are going to look sharp when attached to the Chondola.  



Towers flying on Friday!

October 1, 2008 14:32 by Sunday River

This Friday, October 3 is the date for flying in the lift towers.  All are welcome to come and watch, but please stay off of the trails and watch from South Ridge Lodge.  Also, be advised that traffic will not be allowed on hotel hill road between South Ridge and Barker as loads will be flown over this road.

Photos and video to come!

 


Bottom terminal coming together

September 19, 2008 09:51 by Sunday River

Work this week focused on the base area.  The crane came in to place the framework for the bottom terminal, while the new retaining wall below the lift was being back-filled as we get ready to level the area in front of South Ridge lodge. 

 


Concrete Fly-in

September 12, 2008 15:02 by Sunday River

We flew concrete up to the last four footings this morning, picking up from a cement truck positioned near the top of Lift two and dropping in the footings higher up the line.  Earth work continued in front of South Ridge as the bottom terminal components are being moved up from Lot 5.

 

 


September Chondola Video

September 9, 2008 11:36 by Sunday River

 

sundayriver.com